Lagos Rail Mass Transit Purple Line Pre-feasibility Study
Project Image: 
Client: 
Netzone Consortium
Project Location: 
Lagos, Nigeria
Role: 
Consultant
Status: 
Completed in July 2014.

 

The Purple Line is planned to run for 48km from the Lagos State University (LASU) to Redeem in Ogun State via Igando, Egbeda, Iyana Ipaja, Agege, Ogba, Berger and Mowe/Ibafo.

 

The study focused on the identification of feasible modes to operate the MRT line, based on the physical characteristics of the corridor and projected demand, and an assessment of the economic benefits and financial feasibility of the scheme. FAO Consulting tasks also included analysis of the potential MRT patronage, a review of alternative MRT technologies and economic and financial evaluation of the proposals. In addition, the terms of reference for a bankable feasibility study were developed as well.

Contact Us

Head Office
104A Bode Thomas Street,  
Surulere  
P.O. Box 800, Marina
Lagos, Nigeria

Ibadan Office
Old Testing Ground - Eleyele
Eleyele Road, Ibadan

T: +234 1 454 6350  | M: +234 708 675 6170  
E: info@faoconsulting.com
W: www.faoconsulting.com





Connect with us

Copyright 2015 FAO Consulting International Ltd | All rights reserved